
Farmhouse, gaon ka kothi, ya khet ke kinare quarter — chhat par solar lagao to bijli bill kam, aur central subsidy bhi mil sakti hai agar sahi portal ho: pmsuryaghar.gov.in. Ye PM-KUSUM pump wala portal nahi hai, na hi open-access MW plant.
2026 guide: ₹30k/kW (2 kW tak), ₹78k fixed (3 kW+), empaneled vendor, ALMM, DBT ~15 din, 6.75% loan, aur June 2026 ALMM List-II link.
Sirf pmsuryaghar.gov.in par empaneled vendor + ALMM List-I (aur jahan lagu ho List-II cells) module. Offline cheap panel = subsidy zero + net-metering problem. ALMM List-II cost guide zaroor padho.
Ek Minute Mein PM Surya Ghar
| Item | Detail |
|---|---|
| Portal | pmsuryaghar.gov.in |
| 2 kW tak | ~₹30,000/kW |
| 3 kW+ | ₹78,000 fixed |
| Vendor | Portal par empaneled |
| Panel | ALMM |
| Paisa | DBT ~15 din (clean case) |
| Loan | ~6.75% (bank circular) |
PIB March 2025 mein rooftop registration tezi ka zikr aaya — matlab scheme active hai, par tumhare DISCOM ko 4–8 week bhi lag sakte hain. PIB = trend, personal approval date nahi.
Farmhouse vs Khet — Kaun Sa Scheme?
| Scene | Scheme |
|---|---|
| Ghar/farmhouse chhat, domestic meter | PM Surya Ghar |
| Khet mein solar pump | PM-KUSUM B/C — guide |
| Khet par MW plant | Developer / rajya policy |
Bungalow chhat par Surya Ghar + alag connection par KUSUM pump — theek agar documents sach hain. Dairy load ko ghar ka meter dikha ke fraud — audit hoti hai.
Subsidy Example
2 kW: ~2 × 30,000 = ₹60,000 central
3 kW: ₹78,000 fixed (3 × 30,000 nahi)
State top-up alag jodo. Vendor quote se net nikalo.
Subsidy eligible capacity par — bina DISCOM approval oversize = redemption fail.
Apply Steps 2026
- pmsuryaghar.gov.in register — bijli account + OTP
- Empaneled vendor — quote par ALMM model number
- Site survey — chhat load, net meter
- Install — portal vendor specs
- DISCOM inspection + bi-directional meter
- Portal redemption
- DBT bank mein ~15 din
ALMM June 2026 — Hamari Do Guides
WhatsApp par "import chalega" — sarkari rooftop ke liye mat suno.
Invoice par List-I + cell source likhit mangao.
6.75% Loan — Kab Lena Smart
- Upfront kam chahiye
- EMI kam purani bill (AC, dairy, farmhouse light)
Hybrid inverter extra cost — load shedding zyada ho to sochna.
Common Galtiyan
- Non-empaneled dealer
- Pehle panel, baad mein portal
- Bill naam ≠ bank account
- ALMM ignore (June 2026 ke baad)
- KUSUM portal mix — pump line par rooftop file
Solar ke saath: PMKSY drip, polyhouse MIDH, poori subsidy list.
Bottom Line
Farmhouse/rooftop → PM Surya Ghar, pmsuryaghar.gov.in, 30k/kW (2kW), 78k fixed (3kW+), empaneled + ALMM, DBT ~15 din, ~6.75% loan. Pump/khet MW → PM-KUSUM.
Disclaimer: Slab aur ALMM badalte hain. pmsuryaghar.gov.in, mnre.gov.in verify. Ask Kisan MNRE nahi.
Last verified: June 2026.
अक्सर पूछे जाने वाले प्रश्न
PM Surya Ghar 2026 mein subsidy kitni hai?
Central slab: lagbhag ₹30,000 per kW 2 kW tak; 3 kW aur upar par ₹78,000 fixed (portal rules ke hisaab se ek connection per account). State top-up alag. Net kharch empaneled vendor quote minus subsidy se nikalo — pmsuryaghar.gov.in par.
Kya kisan farmhouse ya dehat ke ghar par apply kar sakta hai?
Haan, jahan valid domestic bijli connection ho aur DISCOM net-metering allow kare. Farmhouse, gaon ka makan — registered consumer ke naam par. Khet par open-access ya PM-KUSUM Component A alag portal — mix mat karo.
PM Surya Ghar mein ALMM panel zaroori hai?
Haan. Sarkari rooftop scheme ke liye MNRE ALMM List-I modules. 1 June 2026 ke baad kai grid project par List-II cells bhi — vendor se model number likhit lo. Hamari ALMM guides padho.
Installation ke baad subsidy kab aati hai?
Portal par redemption + inspection complete hone par DBT aksar ~15 din mein bank account mein — DISCOM approval aur sahi documents par. Galat account ya non-ALMM panel = delay ya reject.
Loan option hai kya?
Scheme linked banks par lagbhag 6.75% loan (live circular check). 3 kW par subsidy + loan se upfront kam ho sakta hai — EMI vs purani bijli bill compare karo.
