1 June 2026 se ALMM List-II lag chuka hai. Dealer ek kehte hain "abhi lagwa lo rate badhega", doosre "wait karo supply theek ho jayegi". PM Surya Ghar, chhat net metering, ya khet par solar plan wale kisan beech mein fasse hain — advance de diya, par non-compliant panel ka dar.
Ye article decision framework hai — har kisi ke liye ek hi jawab nahi. Locked quote par abhi install vs List-II supply ka wait — dono ke pros/cons simple Hinglish mein.
Pehle padho: June 2026 ke baad on-grid mehnga? aur ALMM ka asli asar kisan par.
Locked quote tabhi kaam aata hai jab usme ALMM List-I model aur List-II cell likha ho — 1 June ke baad commission hone wale project ke liye. Munh par promise DISCOM inspection par fail hota hai.
Do raaste — abhi vs wait
| Raasta | Kab smart | Risk |
|---|---|---|
| Abhi install | Likhit ALMM quote; delivery date; commission timeline clear; ya Category I/II exemption docs ready | Supply late; DISCOM slow |
| Wait | Vendor compliant module nahi de pa raha; exemption proof nahi; purana sasta non-ALMM quote | Rate na gire; subsidy quota bhare |
Abhi lagwayen — checklist (quote lock ho)
Vendor ne rate hold diya ho ya token advance le liya ho.
- Likhit quotation — module make, model, ALMM List-I number, List-II cell maker
- Delivery + commissioning — DISCOM slow ho to nuksan kiska?
- Install vs commission date — module 1 June se pehle poori site par lage, meter baad mein — NISE Category I dekho (ALMM guide)
- Subsidy portal register — PM Surya Ghar / state scheme pehle
- Compare — compliant abhi vs 3 mahine wait + lost unit (bacha hua ₹3–5/unit × kWh)
Abhi lagwana achha candidate: 3–5 kW chhat, vendor ke paas domestic stock, net-meter appointment 4–6 hafte, quote market se ≤10% upar — fantasy rate nahi, hardware lock.
Wait — jab sabr rational hai
Wait tab socho jab:
- Quote mein non-ALMM "discount" ho
- Vendor bole List-II supply 12+ hafte, ALMM letter nahi
- June ke baad net metering chahiye aur Category II steps (zameen, loan, connectivity) documented nahi (farmer impact)
- State subsidy quota is quarter band nahi — jaldi nahi
- Sirf Component B pump — stock pehle se List-I ho sakta hai; List-II zyada grid commission ko affect karta hai (phir bhi model verify)
Wait karte waqt:
- Do naye ALMM quote lo
- mnre.gov.in monthly check
- Shadow survey kar lo — stock aate hi turant install
- WhatsApp forward ki jagah NISE/MNRE order padho
Paisa hisaab — 5 kW example
600 kWh/month bachti ho, ₹8/unit → ₹4,800/month.
| Scenario | Extra kharcha | 3 mahine wait — loss |
|---|---|---|
| Compliant quote +₹25,000 | Ek baar ₹25,000 | ~₹14,400 unit loss |
| ₹15,000 rate girega wait | Pakka nahi | ₹14,400 + subsidy risk |
"Saste panel" ke wait mein aksar aaj compliant premium dena sasta padta hai — jab tak wait chhota ho aur subsidy cap na bhare.
Khet / project type
| Type | Abhi? | Note |
|---|---|---|
| PM-KUSUM B pump | Aksar haan (ALMM listed) | List-II commission se kam linked |
| Component C pump | Case by case | Weak grid bhi matter — on-grid vs hybrid |
| Open-access MW | Kagaz heavy | Category II steps chahiye |
| Agrivoltaics 2.0 | Guideline wait | PM-KUSUM 2.0 |
Red flags — "kal hi lagwa do" pressure
- "ALMM subsidy ke liye zaroori nahi" — jhooth zyada central scheme par
- Quote mein model number nahi
- 100% cash, portal ID nahi
- Net-meter apply skip karne ka pressure
- Import module List-II path ke bina June ke baad commission
Decision tree (short)
1 June ke baad net metering / open access commission?
├── Haan → List-I + List-II cells YA valid NISE exemption
│ ├── Exemption docs hain? → Category I/II timeline follow
│ └── Nahi? → Sirf confirmed ALMM stack (abhi ya wait stock)
└── Nahi (off-grid pump / pehle commission) → List-I subsidy ke liye; timing kam critical
Hamari editorial rai
PM Surya Ghar sanction + likhit ALMM quote fair premium par ho to: monsoon sun waste mat karo, install karo — rumoured rate crash ka wait risky. Quote vague / non-ALMM ho to: wait, vendor badlo, subsidy bachao.
Open-access — zameen hai module site par nahi — wait until compliant supply clear; galat stack par advance mat do.
Chhat + pump ek saath? Pump cost guide — ek vendor, ek ALMM paper trail, inspection easy.
Disclaimer: ALMM, NISE, rate badalte rehte hain. Ye guide educational hai — legal advice nahi. mnre.gov.in, NISE, DISCOM se verify karo. Ask Kisan MNRE nahi hai.
Last verified: 15 June 2026.
अक्सर पूछे जाने वाले प्रश्न
ALMM List-II ke baad solar abhi lagwayen ya wait karein?
Agar likhit quote mein ALMM List-I module aur List-II cell clear hai aur delivery date fixed hai, abhi lagwana rate badhne se bachaa sakta hai. Agar vendor compliant stock nahi de pa raha aur 1 June ke baad net metering chahiye, to wait karke sahi listed panel lena non-ALMM se better hai.
Quote lock hai par panel 1 June ke baad aaye to?
Commissioning date aur module/cell compliance matter karti hai. 1 June se pehle saare module site par lage hon par meter baad mein ho — Category I ke liye NISE portal par 30 June 2026 tak claim ho sakta hai. Sasta non-ALMM quote subsidy/net meter reject karwa dega.
Price girne ka wait karna chahiye?
Analyst bolte hain 12–18 mahine mein domestic cell supply badh sakti hai, rate soft ho sakte hain. Guarantee nahi — wait karte waqt generation income aur state subsidy quota dono miss ho sakte hain. Aaj compliant quote vs 3 mahine wait ka hisaab lagao.
Kya PM-KUSUM pump par ALMM-II asar karta hai?
PM-KUSUM pehle se ALMM List-I module mangta hai; June 2026 se List-II cell rule net-metering / grid project ko tight karta hai. Off-grid pump bhi listed module chahiye — mnre.gov.in par model verify karo.
Poori ALMM detail kahan hai?
Hamare do guide padho: [ALMM cost June 2026](/blog/almm-list-ii-on-grid-solar-cost-june-2026) aur [kisan par asar](/blog/almm-list-ii-kisan-par-asar-june-2026). Official list mnre.gov.in; exemption NISE portal.