PM KUSUM Component C Mein Kya Problems Aa Rahi Hain?

Feeder solarisation delay, kagaz, surplus export, DISCOM — Component C ki common problems.

लेखक: Ask Kisan Editorial6 min readRead in English
Grid connected feeder par solar

PM-KUSUM Component C se grid pump solarise aur poora feeder cover hona tha — surplus bijli DISCOM ko. Paper par 35 lakh pump. Ground par file atak ti hai: feeder solarisation delay, land record, surplus export confusion, DISCOM coordination.

Component B wale padosi ko pump mil gaya, aapka Component C months se "technical review"? Ye guide kyun, kya fix, kaise escalate — block office jalaye bina.

Component C state implement hota hai. Surplus export B jaisa nahi. Surplus agreement samjhe bina mat sign karo — nodal + DISCOM likhit chahiye.

Component C vs B — ek table mein kyun mushkil

Component BComponent C
GridOff-grid pumpPehle se grid connection
ScopeEk kisanPoora feeder
DISCOMKamSurvey, meter, surplus — central
TimeAksar shortLambа — batch tender

C = "B + net meter" nahi — feeder scale grid integration.

Problem 1 — Feeder solarisation delay

11 kV agricultural feeder par kayi tubewell — solar plan batch mein.

Delay kyun:

  1. Feeder priority list mein nahi — saal mein X feeder district
  2. Transformer capacity — upgrade alag queue
  3. Tender — EPC select hone tak gaon wait
  4. Announcement slide par feeder, DPR mein nahi

Kisan kya kare

  • Nodal se feeder naam + batch number likhit
  • DT loading study hua ya nahi pucho
  • Same feeder kisan group / FPO
  • MNRE dashboard vs state claim match

Problem 2 — Land record, naam mismatch

Rejection:

  • Bill baap / purane malik ke naam
  • Joint holding — ek bhai ne apply, baaki NOC nahi
  • Tenant — landlord consent nahi
  • Pump gauchar / canal — proof nahi

Fix

  1. DISCOM name transfer — 2–8 hafte
  2. Tehsil ownership update
  3. Nodal NOC format — sab signature
  4. Geo-tag pump, meter, boundary — DPR match

Pillar PM-KUSUM — C zyada tar kagaz par fail.

Problem 3 — Surplus export DISCOM ko

Sunte ho: "Extra bijli se paisa". State specific:

  • Kuch jagah pump account adjust
  • Kuch feed-in tariff alag meter
  • Export hours cap
  • Bi-directional meter kharcha kiska

Likhit jawab lo:

  1. Export meter kiska?
  2. Net meter ya alag generation meter?
  3. Settlement monthly/yearly?
  4. Grid down — anti-islanding?
  5. Subsidy export meter commissioning se tied?

Surplus bina settlement = Rajasthan bill dispute jaisa shock.

Problem 4 — DISCOM coordination tootna

Beech mein MNRE → nodal → DISCOM gap:

  • Nodal approved, DISCOM ke paas work order nahi
  • Inspection fail — kisan ko reason nahi mila
  • Bi-directional meter stock khatam
  • Feeder EPC alag, pump vendor alag — blame game

Escalation ladder

  1. Block RE / agriculture — status diary
  2. District nodal officer
  3. pmkusum.mnre.gov.in helpline
  4. DISCOM chief grievance — application ID
  5. RTI dates ke liye — pehle step nahi, respect se

Feeder naam (bill ya transformer plate se) par WhatsApp group — 10 aawaz ek akeli "sir check" se tez.

Problem 5 — Install ke baad trip / weak pump

On-grid pump trip fix padho. C zyada sensitive:

  • Voltage fluctuation
  • Phase imbalance
  • Export limit software — weak lagega

Trip code log — PM-KUSUM empanelled warranty.

Component C vs A — mat mix karo

  • A — MW plant, PPA
  • C — pump + feeder programme

Galat component apply — saal bhar wait.

Stuck file checklist

  • Naam = Aadhaar = land
  • Feeder naam DISCOM survey se confirm
  • Surplus terms signed
  • Bi-directional meter status
  • Portal screenshot monthly
  • MLA office formal grievance ke baad (optional)

State examples — delay kahan dikhta hai (indicative)

Rajasthan (RECL route): Feeder batch tender ke baad survey pending list lambi — kisan ko sirf "approved" SMS, DISCOM field team abhi nahi aayi.

Gujarat: Grid pump density zyada — transformer overload pehle solve, phir solar meter — C file "technical hold".

UP / Maharashtra: Component B fast move; C mein feeder naam bill par clear na ho to file atak ti.

Ye general pattern hai — apne state nodal se district-wise pending Excel mangna valid hai RTI se pehle.

FPO / group approach — kaise organize karein

  1. Transformer plate se feeder naam likho — 10–15 kisan ek WhatsApp group
  2. Ek coordinator (padha likha yuva) portal status har hafte
  3. Collective letter SDM / nodal ko — "Feeder XYZ, 47 pending files"
  4. Vendor ko group rate negotiate — par empanelment verify karo

Akela kisan kabhi-kabhi feeder priority list mein neeche reh jata hai; group political + technical dono taraf dikhta hai.

Component C approval ke baad bhi pump kyun nahi chalta?

Kabhi-kabhi solar VFD lag gaya par grid neutral / phase issue se sync nahi hota — bore silent, meter import dikhta hai. Ye DISCOM line quality case hai, vendor fraud nahi hamesha.

Checklist:

  • Grid available hours vs solar hours overlap
  • Changeover switch sahi position — solar / grid / off
  • Earthing common pit pump aur controller ke liye

Ye topics on-grid pump trip guide se overlap — dono padho agar C install ho chuka ho par paani nahi.

Portal status "approved" par field zero — kya karein

Nodal portal green tick dikhata hai par DISCOM work order number nahi — ye gap sabse common frustration hai. Email / letter mein do number mango: (1) nodal approval ID, (2) DISCOM WO ID. Dono na ho to file abhi billing / field stage mein nahi pahunchi — wait with proof, panic with vendor advance nahi.

Bottom line

Component C feeder scale par grid pump dard kam karta hai — par delay, kagaz, surplus, DISCOM hazaar file rokte hain. Naam theek, feeder group, surplus likhit, date + ID se escalate — sirf gussa nahi.

B simple tha; C mein gaon coordination bhi chahiye.


Disclaimer: State/phase se rule alag. pmkusum.mnre.gov.in verify. Ask Kisan MNRE/DISCOM nahi.

Last verified: June 2026.

खर्च, सब्सिडी और योजना के नियम राज्य और फंडिंग विंडो के हिसाब से बदलते रहते हैं। निवेश से पहले हमेशा आधिकारिक पोर्टल (nhb.gov.in, mnre.gov.in, agriinfra.dac.gov.in और अपने राज्य के बागवानी पोर्टल) पर जांच करें।

अक्सर पूछे जाने वाले प्रश्न

PM-KUSUM Component C kya hai?

Component C grid-connected kheti pump ko solarise karta hai aur feeder-level solarisation support karta hai — surplus DISCOM ko ja sakti hai. National target lakhon pumps; implementation state nodal agency + DISCOM se pmkusum.mnre.gov.in guidelines ke under.

Feeder solarisation delay kyun hota hai?

Feeder select dispute, weak rural substation, DISCOM survey pending, equipment ke liye land, tender cycle, ek feeder par kayi kisan coordination — Component B se structurally mushkil.

Land record ki kya problem aati hai?

Pump/land naam match, bijli connection applicant ke naam, kabhi co-owner NOC. B1/Khasra aur DISCOM name mismatch — rejection top reason. Apply se pehle naam theek karo.

Surplus export ka kya hota hai Component C mein?

State guidelines se — metering, payment ya adjustment alag-alag. Rooftop net metering jaisa mat assume karo. Nodal agency se likhit terms lo.

Atka hua application aage kaise dhakelenge?

Har step date ke saath likho, block se state nodal (RECL, GUVNL route) tak escalate, zarurat par RTI status, same feeder ke kisan group banao — group complaint tez chalti hai.